An information system often includes the software, the database, and the re-lated manual processes.
Systems design consists of activities to describe the solution to the problem
Agile refers to the flexibility that programmers have in taking on various as-signments.
The System Vision Document is usually developed before the project actu-ally begins.
The project plan is required to get the project approved
Those activities that enable a person to describe in the detail the system that solves the need is called
Two of the primary elements that are included in a Work Breakdown Struc-ture include:
The purpose of a use case is to
how many components that are included in a System Vision Document